16
Marshall mix iterations tested
3-Edge
Bearing test RCC pipe QA/QC
100%
Exact BOQ take-off verification
Disciplined engineering execution
Connecting hands-on site operations with rigorous material standards and detailed construction cost estimation.
Site Execution & Supervision
QA/QC & Material Testing
Estimation & Tendering
Sewerage pipeline laying, manhole construction, and direct alignment monitoring strictly adhering to approved CAD drawings.
Three-edge bearing tests on RCC pipes, dimensional verification, and ASTM compliance documentation across production runs.
BOQ preparation, quantity take-offs, rate analysis, and verification of contractor invoices against site specifications.


Asphalt Marshall mix optimization
Evaluated 16 mix combinations incorporating marble waste aggregate and Rice Husk Ash filler. Achieved 1545 kg Marshall stability, 3.3% air voids, and 15.1% VMA at 30% RHA content.
This empirical research demonstrated a verified 19.5% approximate cost reduction while exceeding standard structural density parameters for highway pavement infrastructure.
Direct site supervision, QA/QC testing, or quantity estimation for regional infrastructure developments.