


Final Year Research
A comprehensive evaluation of 16 distinct mix combinations using marble waste aggregate and rice husk ash filler. Laboratory testing measured bulk specific gravity, Marshall stability, flow, and voids in mineral aggregate.
The optimal R30-B06 combination (30% RHA + 6% bitumen) delivered a Marshall stability of 1545 kg alongside an estimated 19.5% material cost reduction without compromising volumetric parameters.




Site Execution
Infrastructure supervision and quality control
Selected photographic documentation of urban sewerage installation, manhole construction, and factory-floor quality verification.
Verify engineering credentials or discuss project execution
Available for site engineering, project coordination, and technical estimation roles.
